TAQA – Tern Alpha Return to Drilling Rubber Lined Butterfly Valves CL. 150 WCB / AB2 & CF8M

About TAQA  – Tern Alpha

Tern Alpha is a fixed installation serving as a manned drilling and production installation for the Tern field in block 210/25 in the East Shetland Basin of the northern North Sea. It also serves as a production facility for the Hudson, Kestrel, Falcon and Cladhan fields.

  • Field discovery: April 1975. / Date of construction: 1988.
  • The facilities are equipped for up to 175 personnel.
  • Installation structure: The installation consists of a 4-legged steel jacket sub-structure, anchored by piles to the seabed.
  • The Module Support Frame (MSF), which is an 8-legged structure attached in one piece to the jacket, acts as a base support for two levels of modules.

Specification

The Tern Alpha return to drilling project RFQ was delivered by Frenstar in 4 weeks.

Image courtesy of TAQA  – Tern Alpha

Outcome

The client was satisfied with Frenstar’s performance in delivering valves on time within a lead time of 4 weeks and follow on packages are currently ongoing for this end user.

Categories: Oil & GasCase Studies