About MODEC – FPSO Cidade De São Paulo MV23
The FPSO Cidade de São Paulo MV23 is deployed in the Sapinhoá (formerly Guara) field, BM-S-9 Block in the giant “pre-salt” region of the Santos Basin. The FPSO is capable of processing 120,000 barrels of oil or 150,000 barrels of total fluids per day.
Specification
The MV23 Project was a factory lead time project for which we supplied various bore rubber lined and high performance butterfly valves up to 28” to EPC contractor. Materials were DI/SDSS & CF8M/CF8M . We supplied the valves to specification within agreed lead time.
Outcome
MODECs’ EPC contractor was pleased with Frenstar’s delivery and documentation quality in the supply of these valves.