Frenstar Valves

Valve Manufacturer, Stockist & Project Solution Specialist

Multi Supply Framework from 2007 to 2017

(Total Acquisition) Present supply continues to North Oil JV QATAR

About Al Shaheen

There are 30 platforms, 300 operational production and water injection wells, as well as 26 exploration and appraisal wells in block 5 and its extension area.

In March 2010, Maersk completed the installation of 15 new platforms and related offshore facilities at the field under the Al Shaheen 2005 FDP. Installation of 131 of the 160 production and water injection wells were also completed. The remaining wells were completed by May 2010.

The platforms are interconnected by 18 120km-long subsea pipelines with power distributed via five 40km-long subsea cables.

Frenstar has supplied Butterfly valves since 2007 to Maersk Oil MOTS-16 Valves specification as part of a Framework agreement and hold stock of compliant material for these specifications.

Materials supplied – 6MO / Super Duplex Stainless Steel (SDSS) / Aluminium Bronze (Al. Bronze)

Categories: More Studies